Invictus Brewing Company

Blaine, MN

Using SIPs benefited the project in several ways. First and foremost was the speed at which the building was erected. We estimate that we saved roughly 30 days as compared to a steel building. Once the shell was completed, we needed to heat the inside in order to pull the frost out of the ground. By having a complete SIP envelope, we were able to complete this process more quickly than normal. This not only saved time and sped up the project, but it also resulted in considerable savings in the cost of heating during the construction process.

  • Builder
    Panelworks Plus, Inc. / GCM Construction
  • Architect/engineer:
    Wilkus Architects
  • High Performance:
    Yes

Project Gallery

  • Awards/Certifications:
    Building Excellence Award
  • BEA:
    2019 SIPA Building Excellence Awards First Place Winner High Performance Commercial/Industrial/ Institutional Buildings under 10,000 sq. ft. category
  • Any additional comments on the project:
    The project was initiated late in the fall of 2017 and winter construction was inevitable. Using SIPS benefited the project in several ways. First and foremost was the speed in which the building was erected. We estimate that we saved roughly 30 days as compared to a steel building. Once the shell was completed, we needed to heat the inside in order to pull the frost out of the ground. By having a complete SIP envelope, we were able to complete this process more quickly than normal. This not only saved time and sped up the project, it resulted in considerable savings in the cost of heating during the construction process.

Ready to work together?